Helical Tieback Anchors – Blount Island Naval Station
March 13, 2020Category: Commercial FoundationsChallenge LRE Foundation Repair was hired by RUSH Marine to install (61) 2.0” square bar helical piers. The piers were designed by the Engineer of Record (EOR) to tieback the…
Clay County Clarifier Tank #2
March 13, 2020Category: Commercial FoundationsChallenge Clay County Utility Authority (CCUA) obtained Ground Penetrating Radar and found that an 18 inch deep by 20 to 30 foot anomaly had formed at the North side of…
Solana Bay Condominium
December 15, 2017Category: Foundation RepairChallenge The subject property is comprised of 16) 2 story masonry structures and a pool building, with a total of 110 units. Initially one building was tested in September 2010…
Tieback Anchor and Retaining Wall Project
December 15, 2017Category: Commercial FoundationsChallenge A property owner living on the beach in St. Augustine was experiencing pool shell movement due to loose soil conditions. The sandy conditions were causing the pool shell to…
Private Residence PreConstruction Helical Piles
December 15, 2017Category: Foundation RepairChallenge This property is located in Central Hernando County, FL. Due to concerns over high clay soils and sinkhole activity in this part of Florida, the owner hired a Geotechnical…